THE SANITARY OPERATING AUTHORIZATION BASED ON THE EVALUATION REPORT FOR HEALTHCARE UNITS WITH BEDS*
Online
Cetateni
National
The sanitary operating authorization based on the evaluation report is the administrative procedure by which the competent authority assesses the conformity of the objective, prepares the evaluation report, and issues the sanitary operating authorization or the notification of its rejection.
If the technical project and the drawing plans are not current/updated, the following shall be specified in writing:
a. On the plan, it will be recorded that no changes have occurred compared to the designed situation, and if changes have occurred, these should be graphically recorded on the plan. In the first case, the beneficiary signs (name, surname, signature, and stamp). In the second case, along with the beneficiary, jointly with them, the original designer will record acceptance or refusal for the changes, the acceptance or refusal will be signed and stamped by both the beneficiary and the designer (name, surname, signature, stamp);
b. The notes will be made on each plan (where applicable).
The sanitary operating authorization can be issued in emergency mode - 5 working days from the submission of the file, by paying an emergency fee of 150 lei.
*The sanitary operating authorization based on the evaluation report is the administrative procedure by which the competent authority assesses the conformity of the objective, prepares the evaluation report, and issues the sanitary operating authorization or the notification of its rejection.
If the technical project and the drawing plans are not current/updated, the following shall be specified in writing:
a. On the plan, it will be recorded that no changes have occurred compared to the designed situation, and if changes have occurred, these should be graphically recorded on the plan. In the first case, the beneficiary signs (name, surname, signature, and stamp). In the second case, along with the beneficiary, jointly with them, the original designer will record acceptance or refusal for the changes, the acceptance or refusal will be signed and stamped by both the beneficiary and the designer (name, surname, signature, stamp);
b. The notes will be made on each plan (where applicable).
The sanitary operating authorization can be issued in emergency mode - 5 working days from the submission of the file, by paying an emergency fee of 150 lei.
*Denumire
Descriere
Obligatoriu
Semnătură digitală
Tip document
Descarcă
Title
Value
Currency
In the event of a dispute between the beneficiary and the competent authority, the provisions of common law shall apply.
Institutional structure
Share your opinion
Provide your opinion about the content of this page. You can leave acomment about what we can improve. You will not receive a response toyour comment. Use the contact form to clarify any questions regardingthe information and services available on this portal.
Did you find what you were looking for?
Help us improve
