Single digital gateway for public services
favorite_border
RO/EN

Inspectorate for Emergency Situations Vasile Goldis Arad*

Available procedures

PROCEDURA
Cetateni
Companii
National
Security Authorization*

​According to Article 301 paragraph (1) of the updated Law 307/2006 regarding fire protection:

Commissioning of new constructions and arrangements, as well as existing ones where modification and/or change of destination works have been carried out, is done only after obtaining the fire safety authorization for the categories specified in HGR 571 of 2016 updated with subsequent amendments and completions.



*
PROCEDURA
Cetateni
Companii
National
Procedure regarding the issuance of the civil protection authorization*

According to Article 30 paragraph (1) letter b) of Law 481/2004 updated regarding civil protection:

The commencement of execution works for new constructions and arrangements or extensions of existing constructions, provided with a basement, with a built area larger than 150 sqm, if the developed area of the new constructions is in accordance with the provisions of Annex no. 1 from GD 862/2016.

*
PROCEDURA
Cetateni
Companii
National
Fire safety certificate for standard designs of constructions with a high degree of repeatability*

Obtaining the fire safety approval for standard projects of constructions with a high degree of repeatability


*
PROCEDURA
Cetateni
Companii
National
PUD-Fire Safety Agreement*
Obtaining PUD approval.
*
PROCEDURA
Cetateni
Companii
National
Fire Safety Permit*
​Agreement for the issuance of the fire safety permit.


*
PROCEDURA
Cetateni
Companii
Institutii
National
Petition procedure*
Procedure for submitting petitions.
*
PROCEDURA
Companii
Institutii
National
Procedure regarding the issuance and cancellation of specific approvals for voluntary and private services for emergency situations*
Procedure regarding approval, establishment, disbanding, as well as the area of competence for the voluntary/private emergency service.
This procedure is addressed to UATs as well as to economic operators/institutions that are required to establish the voluntary/private emergency service.
*
PROCEDURA
Companii
National
Training plan for economic operators and institutions*
This procedure is addressed to economic operators and institutions that are required to draw up the Emergency Preparedness Plan.
*
PROCEDURA
Institutii
National
Locality preparation plan*
This procedure addresses the UATs that are required to prepare the Emergency Preparedness Plan.
*
PROCEDURA
Cetateni
Companii
National
Procedure regarding the issuance of civil protection permits*
According to Article 30 paragraph (1) letter b) of Law 481/2004 updated regarding civil protection:
The commencement of execution works for new constructions and arrangements or extensions of existing constructions, equipped with a basement, with a built area greater than 150 sqm, if the developed area of the new constructions falls within the provisions of Annex no. 1 of HGR 862/2016.
*
PROCEDURA
Cetateni
Companii
National
PUZ Approval-Fire Safety*

Obtaining PUZ agreement.

*
PROCEDURA
Cetateni
Companii
National
PUZ Agreement - Civil Protection*
Procedure for obtaining PUZ approval - Civil Protection.
*
PROCEDURA
Cetateni
Companii
National
PUG-Fire Safety Approval*
Obtaining PUG-Fire Safety approval.
*
PROCEDURA
Cetateni
Companii
National
PUG agreement - civil protection*
Procedure for issuing the civil protection agreement PUG phase.
*
PROCEDURA
Cetateni
Companii
National
Fire safety certificate*
Procedure for issuing the fire safety certificate.
*
PROCEDURA
Cetateni
Companii
Institutii
National
Procedure for receiving in audience*
The documents submitted during the hearing are attached to the request for an audience.
*
PROCEDURA
Companii
National
Modification of hazardous waste transport routes*
Procedure regarding the modification of hazardous waste transport routes
*
PROCEDURA
Cetateni
Companii
National
Location notice in the plot*
Obtaining the placement approval in the plot.
*
PROCEDURA
Cetateni
Companii
National
Notice regarding the provision of access to public roads.*
Obtaining the approval regarding the provision of access possibilities to public roads.
*
PROCEDURA
Cetateni
Companii
National
Procedure for issuing the point of view regarding the obligation to obtain the fire safety or civil protection permit*
Verification of the compliance of constructions and arrangements with the provisions of HGR no.571 of 2016 and HGR no.862 of 2016.
*
PROCEDURA
Cetateni
Companii
National
Agreement for marketing pyrotechnic items*
Obtaining approval for the commercialization of pyrotechnic articles is done after obtaining authorizations from the Territorial Labor Inspectorate and the County Police Inspectorate.
*
PROCEDURA
Cetateni
Companii
National
The agreement for organizing fireworks displays with pyrotechnic articles*
The approval for organizing firework displays with pyrotechnic articles is the document issued, based on the law, by the county emergency inspectorates and the Bucharest municipality, after verifying the measures taken to prevent emergency situations, in accordance with the provisions of the technical regulations in force.
*
PROCEDURA
Cetateni
Companii
National
Procedure regarding the issuance of fire safety approvals*
According to Article 30 paragraph (1) of Law 307/2006 updated regarding fire protection:
The commencement of execution works for new constructions and arrangements or for the modification and/or change of use of existing ones is done only after obtaining the fire safety permit for the categories mentioned in Government Decision 571 of 2016 updated with subsequent amendments and additions.
*
PROCEDURA
Cetateni
Companii
National
PUD Agreement - Civil Protection*
Agreement for issuing the civil protection consent for the PUD phase.

*
PROCEDURA
Companii
Institutii
National
Evacuation plan approval procedure*
The local public administration authorities, based on their own evacuation plans, drawn up by personnel with responsibilities in the field, endorsed by the vice-chairman of the emergency situations committee and by the head of the county/Bucharest municipality emergency situations inspectorate and approved by the chairman of the committee.
Economic operators, based on their own evacuation plans, endorsed by the head of the county/Bucharest municipality emergency situations inspectorate and approved by the chairman of the local emergency situations committee.
*
str. Andrei Saguna, nr 66-72, Arad
Telefon:
Fax: 0257256712
Email: isujar@isuarad.ro

Assistance services

There are no Assistance services registered by this institution

Institutional structure

Serviciul Inspectia de Prevenire/ Compartiment de Control si Activitati Preventive
Serviciul Pregatire pentru Interventie si Rezilienta Comunitătilor
Compartimentul de Informare si Relații Publice
Serviciul Resurse Umane
Serviciul Inspectie de Prevenire/ Comparimentul Avizare - Autorizare
Centrul Operational

This site is managed by the Romanian Digitalisation Authority and is an official website of the Romanian Government
Public Institutions
Need assistance?
EU Institutions
Info
PNRR. Finanțat de Uniunea Europeană
UrmătoareaGenerațieUE
© 2024 roepas.ro